
The drill pipe of a certain oil well in Qinghai was stuck. The effect of using other traditional anchor point stuck tools was not obvious, and the specific stuck-point was not identified.
On January 11, 2026, the client used our company's free point tool (MSPL43C) tool string, the sticking point was accurately determined to be 1,520m.









