
Using the Free Point Indicator Tool to Logging the Horizontal Well
On April 25, 2026, a stuck pipe incident occurred during horizontal well logging operations in a certain region. The client promptly contacted A-One Oil Company for assistance. Our engineers immediately arranged for the tool string of Free Point Indicator Tool to conduct logging operations.
After completing the logging task, A-One Oil's technical engineers analyzed the logging data and determined that the stuck point was located at a depth of 2,826m. Cutting operations were then carried out at that position, and the project was ultimately completed successfully.
On-site Application










